The Water Infrastructure Unlocking Agricultural Finance

Certified hydrogeological scoring for banks, institutions and professional drillers

Benin • Togo • Burkina Faso • Ghana • 87% accuracy validated on 2,009 boreholes

V3.5 • Orabank Partner • 27 data sources
Discover Our Solutions or try free analysis →

Our Professional Solutions

Water infrastructure adapted to each ecosystem player

🏦

WinoFinance

For Banks & Microfinance Institutions

Hydrogeological certification for agricultural loan applications. Reduce defaults by 40% with our certified water scoring.

  • Certification: 50,000 FCFA/file
  • API integration available
  • Partner: Orabank
View banking offer →
🏛️

WinoGov

For Institutions & Local Authorities

Municipal hydrogeological mapping and water infrastructure planning. SDG6 dashboard, project prioritization.

  • Mapping: from 2M FCFA
  • Water master plan
  • Automated reporting
View institutional offer →
⚒️

WinoDrill

For Professional Drillers

Optimize your success rate with pre-drilling analysis. Go from 65% to 85% success. Certified network.

  • Pro Pack: 300,000 FCFA/month
  • "Certified Driller" badge
  • 3-5% commission on leads
Become a partner →
ENTRY POINT

Free Water Analysis for Individuals

For farmers and individuals: test our technology in 30 seconds. Limit: 1 free analysis per plot.

Try free analysis

🌍 West Africa Golden Triangle

Geographic coverage with validated precision by zone

🇧🇯
Benin
87%
✅ Validated • 2,009 boreholes
🇹🇬
Togo
82%
📊 Advanced pilot phase
🇧🇫
Burkina Faso
78%
🚀 Expansion in progress

🔬 Collective Intelligence: Every well-documented borehole improves the country's overall accuracy. Together, we make water predictable.

📅 West Africa Expansion

3 operational countries. Next launch: Ghana.

🇧🇯
Benin
✅ 87%
🇹🇬
Togo
✅ 82%
🇧🇫
Burkina
✅ 78%
🇬🇭
Ghana
April 2026
🇨🇮
Ivory Coast
June 2026
🇳🇬
Nigeria
2027

Your country is not listed?

Propose a country

They found water thanks to Wino Wino

Real results, changed lives

VERIFIED

"I didn't know where to drill on my 2 hectares. The Wino Wino analysis showed me the exact spot. The driller found water at 18 meters exactly as predicted!"

KM
Kofi M.
Market gardener, Bassila (Collines)
Result: Water at 18m • Flow 3.5m³/h Dec. 2025
VERIFIED

"My first borehole failed - 2 million FCFA lost. With the Wino Wino analysis, the second one succeeded on the first try! My 50 cows have water all year round."

AS
Adjovi S.
Cattle farmer, Natitingou (Atacora)
Result: Water at 22m • 50 animals watered Nov. 2025
LOAN

"Thanks to the certified Wino Wino report, my bank agreed to finance my borehole. The document proved to them that the risk was low. Borehole succeeded, loan repaid!"

ED
Emmanuel D.
Pineapple producer, Allada (Atlantique)
Result: Agricultural loan 2.5M FCFA Oct. 2025
Request my free analysis

Response within 24-48h via WhatsApp

Validated Performance

87%
Validated accuracy
2,009
Boreholes analyzed
127
Certified drillers
27
Data sources

They Trust Us

🏦 Orabank 🏛️ Ministry of Water Benin 🎓 University of Abomey-Calavi 🚀 Seme City